<\/a><\/p>\n <\/p>\n Demolition of the existing bathhouse and full construction of a new 1,320SF bathhouse building including a sewer pump station and holding tanks. This project faced the challenge of severe winter weather while being located on the coastline. Work included: … Read More<\/a><\/p>\n","protected":false},"author":4,"featured_media":12,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[5],"tags":[],"class_list":["post-1017","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"aioseo_notices":[],"jetpack_featured_media_url":"https:\/\/dlkingnh.com\/wp-content\/uploads\/2015\/06\/hampton-beach-house.png","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p6paBy-gp","_links":{"self":[{"href":"https:\/\/dlkingnh.com\/wp-json\/wp\/v2\/posts\/1017","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dlkingnh.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dlkingnh.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dlkingnh.com\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/dlkingnh.com\/wp-json\/wp\/v2\/comments?post=1017"}],"version-history":[{"count":1,"href":"https:\/\/dlkingnh.com\/wp-json\/wp\/v2\/posts\/1017\/revisions"}],"predecessor-version":[{"id":1020,"href":"https:\/\/dlkingnh.com\/wp-json\/wp\/v2\/posts\/1017\/revisions\/1020"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dlkingnh.com\/wp-json\/wp\/v2\/media\/12"}],"wp:attachment":[{"href":"https:\/\/dlkingnh.com\/wp-json\/wp\/v2\/media?parent=1017"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dlkingnh.com\/wp-json\/wp\/v2\/categories?post=1017"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dlkingnh.com\/wp-json\/wp\/v2\/tags?post=1017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}Demolition of the existing bathhouse and full construction of a new 1,320SF bathhouse building including a sewer pump station and holding tanks. This project faced the challenge of severe winter weather while being located on the coastline.<\/h5>\n
Work included:<\/strong>
\nDemolition
\nConcrete Foundation
\nSewer and Holding Tanks
\nStructural Framing
\nWindows
\nSiding
\nPlumbing and Mechanical
\nElectrical
\nRoofing
\nPaving Repairs
\nInterior Finishes<\/h5>\n","protected":false},"excerpt":{"rendered":"