Here are a few of our more note worthy projects. Click Image or Title for full post and details:

Fuel System Replacement

NHDOT Epping PS Fuel System Replacement- Epping, NH Remove existing underground storage tanks and fueling system and replace with two new 15,000 gallon underground storage tanks and fueling system Work included: Demolition | Concrete | Structural Steel | Paving | … Read More

HAMPTON BEACH BATH HOUSE

Demolition of the existing bathhouse and full construction of a new 1,320SF bathhouse building including a sewer pump station and holding tanks. This project faced the challenge of severe winter weather while being located on the coastline.   Work included: … Read More

Nashua NH City Hall

Design-Build renovation to the existing entryway to a storefront with two sets double automatic doors and the clerk’s office at the Nashua City Hall. Entryway provides a clearer direction to the clerk’s office. Work included: Demolition Auto door entryway Drywall … Read More

Supreme Court Roof

New Hampshire Supreme Court Roof Upgrades DL King was proud to have been awarded the NH Supreme Court Roof Upgrades Project. This project required abatement of asbestos-containing roof materials, and installation of 3 different roofing systems: synthetic slate, EPDM, and … Read More

Legacy Playground

Legacy Playground- Nashua, NH DL King is proud to have the opportunity to work with the Nashua Department of Parks & Recreations on the Legacy Playground. Completed on time and on budget, the playground is a beautiful place where the … Read More

Pennichuck Water Works

Pennichuck Water Works- Nashua, NH The Pennichuck Water Works restoration project is considered one of our crowning achievements, we combined subcontractor knowledge and experience with our own combined engineering and oversight experience and labor to restore the Pennichuck Water Works … Read More

State House Dome

New Hampshire State Dome Repairs- Concord, NH DL King is proud to direct the NH State Dome Restoration Project. This project included the removal of the existing gold leaf and primer covering the iconic dome and eagle, re-gilding of the … Read More

Fire Training Facility

Fire Training Facility – Bethlehem, NH Design & Build of a three-story fire training building. A completely burn-proof building used in the training of firefighters. Work included: Site Work | Concrete Foundation | Specialty Fire Proof Construction | Water Supply

Brownfields Cleanup

Allied Tannery Brownfields Cleanup – Concord, NH Remediation of contaminated soils left behind during the operation of the old Tannery Site. Excavated and processed original building foundations for use as structural fill material. The remediated site is now usable for … Read More

Nashua NH Mill Yard

Partial demolition of a Nashua millyard building in order to make way for the new Nashua Board Street Parkway. The remaining face of the building was renovated with new windows, doors, canopy, stairs, and ramp. Work included: Demolition | Site … Read More

Nashua BPW CNG Garage Upgrade – Nashua, NH

Design-Build to convert two bays at the Nashua BPW Garage to be code compliant with a facility to support the repair of Compressed Natural Gas (CNG) vehicles. Work included the erection of fire-rated separation block wall; fire-rated doors; OVHD door … Read More

Hollis NH Town Hall – Hollis NH

Exterior renovations to the Hollis Town. New exterior siding was a historically correct cedar shingle. Painting and repairs to exterior trim on the bell tower. Work included: Demolition Historic Renovation Cedar Single Siding Historic Stained Glass Renovation Finish Carpentry Painting